12 Stations To Be Part Of Corridor, Read Full Plan Here  

12 Stations To Be Half Of Hall, Learn Full Plan Right here  

Speedy Rail From Ghaziabad To Noida Airport: The entire venture will price round Rs 16,189 crore and the primary section hall from Ghaziabad to Kasna will price Rs 9,798 crore. Examine how a lot shall be the price of the second section.

delhi meerut rapid rail fare

Noida: Right here comes a chunk of excellent information for the residents of Noida and Better Noida as a brand new fast rail is being deliberate from Ghaziabad to Noida Worldwide Airport. As per a report by the Indian Specific, a survey for the brand new Speedy Rail has began with soil testing, and the structure of stations.

Speedy Rail Challenge: Learn Full Plan Right here

In accordance with the brand new plan by the authorities, the brand new Speedy Rail that shall be linked through Better Noida West and Pari Chowk, shall be constructed in two phases. A 37.15 km-long hall shall be constructed between Ghaziabad and Ecotech-5 (Kasna) within the first section and is more likely to be prepared by 2031. Then, within the subsequent section, a 35.11 km-long hall shall be constructed from Ecotech 6 to the Noida Airport.

An official advised the information day by day {that a} Detailed Challenge Report (DPR) on the venture is predicted to be submitted by the Nationwide Capital Area Transport Company (NCRTC) by March.

As per the plan, a complete of no less than 12 stations shall be a part of fast rail — Ghaziabad RRTS, Ghaziabad South, Better Noida West (Sector 4), Better Noida (Sector 2), Information Park 5, Surajpur, Pari Chowk, Ecotech-6, Dankaur, YEIDA North (Sector-18), YEIDA Central (Sector-21, 35) and Noida Airport.

Price of Entire Challenge: Examine Particulars

The feasibility report steered that the entire venture will price round Rs 16,189 crore and the primary section hall from Ghaziabad to Kasna will price Rs 9,798 crore, the second section will price Rs 6,391 crore.

For the fast rail venture, the officers stated the Centre will bear 20% of the price and the state authorities will bear 50%. Nevertheless, the remainder of the quantity shall be borne by the Yamuna Expressway Industrial Improvement Authority (YEIDA) and Better Noida authority.

It must be famous that the Uttar Pradesh authorities had final 12 months in December accepted linking the Speedy Rail venture with the Noida Worldwide Airport in Jewar.

It’s anticipated that the Noida Worldwide Airport shall be operational by December 2024 and the precedence part of the Delhi-Ghaziabad-Meerut RRTS, from Sahibabad to Duhai, is presently operational.



Rajesh

Meet Rajesh, our astute reporter dedicated to delivering daily insights into the dynamic world of business. With a keen understanding of market trends and a passion for unraveling the complexities of commerce, Rajesh brings you the latest in the business landscape.

Leave a Reply

Your email address will not be published. Required fields are marked *